Veris-industries E50F5 Install User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 34
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
ZL0108-0D Page 7 of 34 ©2013 Veris Industries USA 800.354.8556 or +1.503.598.4564 / suppor[email protected] 10131
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris ‘V’ logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Other companies’ trademarks are hereby acknowledged to belong to their respective owners.
Installation Guide
Power Monitoring
EF, EF
TM
The meter has a number of dierent possible system wiring congurations (see Wiring Diagrams section). To congure the meter,
set the System Type via the User Interface, LON variable cpSystemType. The System Type tells the meter which of its current and
voltage inputs are valid, which are to be ignored, and whether neutral is connected. Setting the correct System Type prevents
unwanted energy accumulation on unused inputs, selects the formula to calculate the Theoretical Maximum System Power, and
determines which phase loss algorithm is to be used. The phase loss algorithm is congured as a percentage of the Line-to-Line
System Voltage (except when in System Type 10) and also calculates the expected Line to Neutral voltages for system types that
have Neutral (12 & 40).
Values that are not valid in a particular System Type display as “----” on the User Interface or as QNAN in the LON variables.
Supported System
Types
CTs Voltage Connections System Type Phase Loss Measurements Wiring
Diagram
Number of
wires
Qty ID Qty ID Type LON variable cpSystemType User Interface:
SETUP>S SYS
VLL VLN Balance Diagram
number
Single-Phase Wiring
2 1 A 2 A, N L-N 10 1L + 1n AN 1
2 1 A 2 A, B L-L 11 2L AB 2
3 2 A, B 3 A, B, N L-L with N 12 2L + 1n AB AN, BN AN-BN 3
Three-Phase Wiring
3 3 A, B, C 3 A, B, C Delta 31 3L AB, BC, CA AB-BC-CA 4
4 3 A, B, C 4 A, B, C, N Grounded
Wye
40 3L + 1n AB, BC, CA AN, BN, CN AN-BN-CN &
AB-BC-CA
5, 6
To avoid distortion, use parallel wires for control power and voltage inputs.
The following symbols are used in the wiring diagrams on the following pages.
Symbol Description
Voltage Disconnect Switch
Fuse (installer is responsible for ensuring compliance with local requirements. No
fuses are included with the meter.)
Earth ground
X2
X1
Current Transducer
Potential Transformer
Protection containing a voltage disconnect switch with a fuse or disconnect circuit
breaker. The protection device must be rated for the available short-circuit current at
the connection point.
CAUTION
RISK OF EQUIPMENT DAMAGE
This product is designed only for use with 1V or 0.33V current
transducers (CTs).
DO NOT USE CURRENT OUTPUT (e.g. 5A) CTs ON THIS PRODUCT.
Failure to follow these instructions can result in overheating and
permanent equipment damage.
Wiring Symbols
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 33 34

Comments to this Manuals

No comments